{"data":{"id":948,"lang":"en","title":"Blue Origin Files FCC Plan for 51,600-Satellite Orbital Data Center to Power AI From Space","summary":"Blue Origin seeks FCC approval for Project Sunrise, a 51,600-satellite constellation to run AI workloads in orbit using solar power.","category":"technology","category_label":"Technology","published_at":"2026-03-21T13:02:57Z","updated_at":"2026-03-21T13:02:57Z","url":"https://techtools.cz/tools/news/article/948-blue-origin-files-fcc-plan-for-51-600-satellite-orbital-data-center-to-power-ai","api_url":"https://techtools.cz/news-api/v1/articles/948?lang=en","markdown_url":"https://techtools.cz/news-api/v1/articles/948.md?lang=en","image_url":"https://i0.wp.com/spacenews.com/wp-content/uploads/2025/11/gallery_ng2-liftoff.jpg?fit=1200%2C796\u0026ssl=1","word_count":172,"reading_time_minutes":1,"sources":[{"url":"https://spacenews.com/blue-origin-joins-the-orbital-data-center-race/","domain":"spacenews.com"},{"url":"https://techcrunch.com/2026/03/20/jeff-bezos-blue-origin-enters-the-space-data-center-game/","domain":"techcrunch.com"},{"url":"https://www.theregister.com/2026/03/20/blue_origin_project_sunrise_orbital_datacenter/","domain":"theregister.com"}],"translation":{"lang":"cs","id":981,"title":"Blue Origin podala žádost o orbitální datové centrum s 51 600 satelity pro AI v kosmickém prostoru","url":"https://techtools.cz/tools/news/clanek/981-blue-origin-podala-zadost-o-orbitalni-datove-centrum-s-51-600-satelity-pro-ai-v","api_url":"https://techtools.cz/news-api/v1/articles/981?lang=cs"},"content":"Jeff Bezos's Blue Origin filed an application with the Federal Communications Commission on March 19 to launch \"Project Sunrise,\" a constellation of up to 51,600 satellites that would function as a distributed data center in orbit. The solar-powered satellites would operate in sun-synchronous orbits at altitudes between 500 and 1,800 kilometers, with 300 to 1,000 spacecraft per orbital plane.\n\nBlue Origin argues the system would \"fundamentally lower the marginal cost of compute capacity compared to terrestrial alternatives\" by shifting energy- and water-intensive AI computing off Earth. The satellites would communicate through optical intersatellite links coordinated with TeraWave, Blue Origin's broadband constellation announced in January, and rely on New Glenn's heavy-lift capacity for deployment.\n\nThe filing notably lacks specifics on satellite design and technical implementation. Blue Origin also requested a waiver from FCC milestone rules that would require half the constellation in orbit within six years and the full fleet within nine. The move puts Blue Origin in direct competition with other companies racing to build computing infrastructure in space."}}